PPA Approval Procedure

QTPPA

Power Purchase Agreement (PPA)

Under Circular No.41/2010/TT-BCT issued by MOIT regulations on the method for determining generation price, the procedures and order for setting up and issuing generation price bracket and approving the power purchase agreement:

Dossiers requesting for the  power  purchase agreement  negotiation for  new power plants consist of below documents:

a)     Correspondence requesting for power purchase agreement negotiation;

b)    Draft power purchase agreement according to the sample

c)     Decision on  the power  plant construction,  attached  with statement  and  basic design of the investment project;

d)    Decision on the approval on total project investment amount including technology investment and total investment cost for specific construction items of the project;

e)     Agreement on  the  connection between  the  power plant  and  national electricity system, attached with connection plan of the power plant;

f)      Assessment report on the power plant investment project of independent consultancy and other attached documents;

g)     Fuel supply agreement for the power plant, with specific regulations on the price of fuel for  power  generation, fuel  transportation  fee, and  attached  extra cost,  fuel  receipt and delivery points and fuel supply time;

h)    Calculation data of transformer capacity and power loss, transmission lines from the power plant to the connection points with national electricity system and calculation data of used power in the power plant;

i)       Calculation data of specific fuel consumption for coal power plant or specific heat consumption gas power plant;

j)       Electricity tariff plan is determined according to the method regulated in Item 2 and Item 3, Chapter II of this Circular.

Detail Circular is attached here.

 

 

 

Customer feedback

Electricity Regulatory Authority of Vietnam

ERAV

"These projects finished and we satisfied with the results. PRP brought us the sufficient and easy-to-use transmission charges calculation model. The IT system and ERAV’s website met our requirement and the training for ERAV’s staffing using the IT system and website was undertaken carefully"

 Thang Long JSC.

TLP "The Grid Impact study was prepared thoroughly and defended successfully. The SCADA and metering system was designed professionally and adequately. We feel pleased with the results PRP brought to us."

 AES Transpower

AES "The study and two supplementary reports was conducted comprehensively and carefully, with accurate computation and precise assessment. We are looking forward to cooperate with PRP in future."

 PV Nhon Trach 2 JSC.

PV NT2 "PRP is an experienced Consultant Company in preparing the Grid Impact Study; we choose them as the perfect Consultant to do it and PRP did not disappointed us."

 



JoomlaWatch Stats 1.2.9 by Matej Koval