SCOPE OF WORK OF RELAY SETTING CALCULATION SERVICE:

* Data colllecting:

    - Local grid connection diagram, Single line diagram of primary equipment

     - Specifications of primary equipment

     - Principle operation diagram, disign diagram of the relay system

     - Secondary diagrams of the relay system

     - Concerning Relay manual, software

* Setting calculation, complete the dossier

* Supmitting the dossier to concerning load dispatch center

* Take the approved setting table and give it to project owner

* Support project owner in synchronizing process

* Support project owner in operation process, fault clearing process.

 
Relay Setting Calculation Process

Relay setting calculation process as the following chart:

qt tinh toan rlbv eng 

Read more...
 
Relay Setting Calculation and Relay Setting Tables

RelayRelay Setting Calculation is important task for Power plant before operation. The parameter in this calculation is use for setting for Relay protection equipment of power plant. 

 

 

 

 

Read more...
 
Grid Impact Study and Grid Connection Agreement

Grid Impact Study and Grid Connection Agreement

 
Technical Designs and Technical Design Agreements (SCADA, Telecom, Protection, Metering)

Technical Designs and Technical Design Agreements (SCADA, Telecom, Protection, Metering)

 
<< Start < Prev 1 2 3 4 5 Next > End >>

Page 1 of 5

Customer feedback

Electricity Regulatory Authority of Vietnam

ERAV

"These projects finished and we satisfied with the results. PRP brought us the sufficient and easy-to-use transmission charges calculation model. The IT system and ERAV’s website met our requirement and the training for ERAV’s staffing using the IT system and website was undertaken carefully"

 Thang Long JSC.

TLP "The Grid Impact study was prepared thoroughly and defended successfully. The SCADA and metering system was designed professionally and adequately. We feel pleased with the results PRP brought to us."

 AES Transpower

AES "The study and two supplementary reports was conducted comprehensively and carefully, with accurate computation and precise assessment. We are looking forward to cooperate with PRP in future."

 PV Nhon Trach 2 JSC.

PV NT2 "PRP is an experienced Consultant Company in preparing the Grid Impact Study; we choose them as the perfect Consultant to do it and PRP did not disappointed us."

 


mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday40
mod_vvisit_counterYesterday132
mod_vvisit_counterThis week832
mod_vvisit_counterLast week927
mod_vvisit_counterThis Month1481
mod_vvisit_counterLast Month4513
mod_vvisit_counterAll days321197

Online (20 minutes ago): 5
Your IP: 34.204.187.106
,
Today: 11 Jul, 2020

Sponsored Links


JoomlaWatch Stats 1.2.9 by Matej Koval