Some Clients of PRP
 
Customers
Project
Activities

sunseap logo

SUNSEAP Group

CMX RE Solar Power Plant

(168MWp)

Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement
 Preparation and Acquirement of Agreements/approvals from relevant authorities for Feasibility Study
 Feasibility Study (FS) and Basic Design

the blue circule1

The Blue Circle Vietnam Co.Ltd

Dam Nai Wind Power Plant 

(40MW)

Power system analysis
aes_transpower
AES Transpower Pte Ltd
Mong Duong II Coal-Fired Power Plant 
(2X600MW) 
Grid Impact Study
1st Supplementary Grid impact Study with installed capacity increase to 1.320 MW
2st Supplementary Grid impact study with new initial data
pecc2
Petro Vietnam Power
Nhon Trach 2 Joint-Stock Company
Nhon Trach II Thermal Power Plant
(750MW)
Grid Impact Study
Studying, analyzing to reduce short-circuit current in Nhon Trach 2 Power Plant
thanglong_power
Thang Long Power Joint-stock Company (TLP)
Thang Long Coal-Fired Power Plant
(2x300MW)
Grid Impact Study
Technical design of SCADA and mettering system
Consulting on international bid
Advising and conducting negotiations for Power Purchase Agreement (PPA)
erav
The Electricity Regulatory Authority of Vietnam (ERAV)
ERAV Support Information Technology/Database: System Design and Training 
General structure design of database and communication system
Detailed design of database, communication system, .v.v
System Implementation and Deployment
User Manual and training for ERAV’s personnel
Transmission charges calculation model development, data collection and calculation
Specification and design of database and model
Information collection
Development of detailed database and computer models
Transmission charges calculation
The stakeholder workshop on the model
Manuals, training on design and use of model and database
Monitoring Operations of the Pilot and Full VCGM project Local consultant for main consultant (IES - Intelligent Energy Systems)

evn

Vietnam Electricity

Information Infrastructure for the Power Market in Vietnam project

Support main consultant review and assess overall current Information Infrastructure of participants in VCGM

Support for conceptual overall information architecture for VCGM
Support for implementation planning of information system for participants synchronous with OIA

marubeni

Marubeni Corporation

Nghi Son 1 Thermal Power Plant  (2x300MW)

Power system analysis in year 2013 and year 2014

Relay setting calculation

doosan

Doosan Heavy Industries Vietnam

Mong Duong II Coal-Fired Power Plant 
(2X600MW) 

Technical design of Metering System.

Technical design of Relay Protection System
Technical design of SCADA System
Technical design of Telecommunication System
Assist Doosan Vina in negotiation with EVN

nedi2

Northern Electricity Development and Investment Joint Stock Company no.2

Ngoi Phat hydropower             plant                        (3x24MW)           

Power system analysis

Relay setting calculation
Preparing the Procedure on cooperation of plant operation
Working with A0/A1 to take approval

2016 05 19

Lao Cai Renewable Energy VN JSC

Coc San hydropower          plant       (3x9.9MW)

Power system analysis

 

Relay setting calculation
Supporting and getting the numbering equipment decision
Preparing the Procedure on cooperation of plant operation
Supporting training and certification of plant operators
Working with A1 to take approval

pcc1

Power Construction JSC No. 1



110kV Nui Phao substation

Power system analysis

Relay setting calculation
Working with A1 to take approval
110kV Bac Song Cam substation

Power system analysis

Relay setting calculation
Working with A1 to take approval
Bac Kan Material Contruction Producing Join-stock Company
Ta Lang Hydro Power Plant
(2x2.25MW)
Grid Impact Study
Technical design of mettering system
Advising and conducting negotiations for Power Purchase Agreement (PPA)
Advising and on Licencing  power operation
gic
Global Insurance Company
 
 
Insurance Agent
 
 
 
 

Customer feedback

Electricity Regulatory Authority of Vietnam

ERAV

"These projects finished and we satisfied with the results. PRP brought us the sufficient and easy-to-use transmission charges calculation model. The IT system and ERAV’s website met our requirement and the training for ERAV’s staffing using the IT system and website was undertaken carefully"

 Thang Long JSC.

TLP "The Grid Impact study was prepared thoroughly and defended successfully. The SCADA and metering system was designed professionally and adequately. We feel pleased with the results PRP brought to us."

 AES Transpower

AES "The study and two supplementary reports was conducted comprehensively and carefully, with accurate computation and precise assessment. We are looking forward to cooperate with PRP in future."

 PV Nhon Trach 2 JSC.

PV NT2 "PRP is an experienced Consultant Company in preparing the Grid Impact Study; we choose them as the perfect Consultant to do it and PRP did not disappointed us."

 


mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday7
mod_vvisit_counterYesterday155
mod_vvisit_counterThis week349
mod_vvisit_counterLast week1236
mod_vvisit_counterThis Month5041
mod_vvisit_counterLast Month4214
mod_vvisit_counterAll days305317

Online (20 minutes ago): 1
Your IP: 3.235.66.217
,
Today: 31 Mar, 2020

Sponsored Links


JoomlaWatch Stats 1.2.9 by Matej Koval